TYPDETAIL

Home / Civil

Concrete Washout Detail - typical civil detail drawing, DWG
Preview of concrete washout detail. The DWG is fully editable.

Text on the drawing

10 MIL PLASTIC LINER OVER BALES AND BOTTOM STRAW BALES, STAKED IN PLACE (2 STAKES PER BALE) 1. CONSTRUCT PER CASQA WM-8. 2. LOCATE 50' MIN FROM STORM DRAIN INLETS AND GUTTERS. 3. POST A "CONCRETE WASHOUT" SIGN AT THE WASHOUT. 4. CLEAN OUT OR REPLACE WHEN 75% FULL. DISPOSE OF HARDENED CONCRETE OFF SITE. DETAIL # - CONCRETE WASHOUT NOT TO SCALE

More civil details

Fiber Roll Detail - DWG drawing

Fiber Roll Detail

Construction Entrance/Exit Detail - DWG drawing

Construction Entrance/Exit Detail

Storm Drain Inlet Protection Detail - DWG drawing

Storm Drain Inlet Protection Detail

Water and Sewer Separation Detail - DWG drawing

Water and Sewer Separation Detail

Sewer Cleanout Detail - DWG drawing

Sewer Cleanout Detail

Wet Tap Connection Detail - DWG drawing

Wet Tap Connection Detail

Utility Trench - Water Line Detail - DWG drawing

Utility Trench - Water Line Detail

Utility Trench - Sanitary Sewer Detail - DWG drawing

Utility Trench - Sanitary Sewer Detail