
Text on the drawing
(E) ROOFING REMOVED UNDER SLEEPER 2X SLEEPER, (2) 16d @ EA. (E) RAFTER (E) RAFTERS / SHEATHING NEW RAFTERS / VALLEY FRAMING BEAR ON SLEEPERS; (E) RAFTERS CHECKED FOR ADDED LOAD BY ENGINEER. SEE ALSO S-ROF-023 (CALIFORNIA FILL). FLASH / WEAVE ROOFING AT VALLEY. N.T.S.







