TYPDETAIL

Home / MEP

Pv Array Roof Attachment - Flashed L-Foot - Section - typical mep detail drawing, DWG
Preview of pv array roof attachment - flashed l-foot - section. The DWG is fully editable.

Codes and approvals referenced

CBC 3111CRC R329

Text on the drawing

2 1/2" MIN. PV MODULE PER ELEC. PLANS RACKING RAIL, ATTACHMENT SPACING PER RACKING ENGINEERING (WIND) L-FOOT W/ INTEGRATED FLASHING UNDER UPPER SHINGLE COURSE (LISTED) 5/16" LAG, 2 1/2" MIN. THREAD EMBED CENTERED IN RAFTER, SEALED PER MFR. (E) 2X RAFTER / TRUSS TOP CHORD ROOF FRAMING CAPACITY FOR ADDED DEAD LOAD (3-4 PSF) PER PLAN. FIRE CLASSIFICATION AND SETBACKS PER CRC R329 / CBC 3111 / CFC 1205. PRE-DRILL PILOT HOLE PER MFR.; MISSED HOLES SEALED. 2" = 1'-0"

More mep details

Transverse Section - DWG drawing

Transverse Section

Longitudinal Section - DWG drawing

Longitudinal Section

Anchor at Deck Detail - DWG drawing

Anchor at Deck Detail

Brace Connection at Deck Detail - DWG drawing

Brace Connection at Deck Detail

Rod to Strut Connection Detail - DWG drawing

Rod to Strut Connection Detail

Bath Exhaust Fan (roof) Detail - DWG drawing

Bath Exhaust Fan (roof) Detail

Bath Exhaust Fan (wall) Detail - DWG drawing

Bath Exhaust Fan (wall) Detail

Range Hood Detail (roof) - DWG drawing

Range Hood Detail (roof)