TYPDETAIL

Home / Roof Framing

Rafter/Truss to Top Plate - H10A Detail - typical roof framing detail drawing, DWG
Preview of rafter/truss to top plate - h10a detail. The DWG is fully editable.

Codes and approvals referenced

ESR-2613

Text on the drawing

RAFTER / TRUSS PER PLAN 15/32" WOOD STRUCTURAL PANEL ROOF SHEATHING SIMPSON H10A TIE @ EACH RAFTER/TRUSS W/ (9) 10dX1-1/2 RAFTER (9) 10dX1-1/2 PLATE (2) 2X TOP PLATE STUD WALL PER PLAN UPLIFT / LATERAL TIE AT EACH RAFTER OR TRUSS U.N.O. INSTALL PER SIMPSON STRONG-TIE CATALOG (ICC-ES ESR-2613). TIE MAY BE INSTALLED ON EITHER FACE OF WALL; DO NOT BEND MORE THAN ONCE. 2X SOLID / VENTED BLOCKING BETWEEN RAFTERS (BEYOND) N.T.S.

More roof framing details

Shear Transfer, Roof Joist to Bearing Wall Detail - DWG drawing

Shear Transfer, Roof Joist to Bearing Wall Detail

2X Ridge Board Detail - DWG drawing

2X Ridge Board Detail

Shear Transfer, Perpendicular Rafter Detail - DWG drawing

Shear Transfer, Perpendicular Rafter Detail

Heel Connection (lap) Detail - DWG drawing

Heel Connection (lap) Detail

Ridge-Rafter Connection Detail - DWG drawing

Ridge-Rafter Connection Detail

Ridge Block Detail - DWG drawing

Ridge Block Detail

Shear Transfer at Eave Detail - DWG drawing

Shear Transfer at Eave Detail

Ceiling Beam Ridge Support Detail - DWG drawing

Ceiling Beam Ridge Support Detail