
Text on the drawing
2'-0" MAX. FLOOR JOISTS CANTILEVERED TO SUPPORT BAY, BAND AT END BAY HEADER / TOP PLATES BAY SILL ON STUD WALL ROOF OVER BAY PER PLAN CANTILEVER LIMITS PER S-FLR-088. ROOF OVER BAY SUPPORTED BY HEADER / RAFTERS TO MAIN WALL PER PLAN. N.T.S.







