
Text on the drawing
6" MAX. PONDING DEPTH 3" SHREDDED HARDWOOD MULCH 18" BIORETENTION SOIL MEDIA (5 IN./HR MIN. INFILTRATION) 12" NO. 57 GRAVEL STORAGE 4" PERF. UNDERDRAIN IF REQ'D, TO STORM DRAIN SIDE SLOPES 3:1 MAX. SIZE PER LOCAL STORMWATER / MS4 REQUIREMENTS. OVERFLOW INLET OR SPILLWAY 6" ABOVE MULCH. LOCATE 10'-0" MIN. FROM FOUNDATIONS U.N.O. BY GEOTECH. PLANTS PER LANDSCAPE PLAN. DETAIL # - BIORETENTION AREA / RAIN GARDEN - SECTION NOT TO SCALE







