Deck Joists over Beam with Hurricane Ties - Section - typical floor framing & decks detail drawing, DWG
Preview of deck joists over beam with hurricane ties - section. The DWG is fully editable.

Codes and approvals referenced

CRC R304.3).ESR-2613H2.5A

Text on the drawing

DECKING PER PLAN 2X8 / 2X10 P.T. JOISTS PER PLAN, CANTILEVER L/4 MAX. (DCA 6) H2.5A TIE (ESR-2613) EA. JOIST TO BEAM, HDG / ZMAX BEAM PER PLAN POST / POST CAP PER S-CON-096 ALL CONNECTORS HDG OR ZMAX W/ MATCHING FASTENERS IN P.T. LUMBER (CRC R304.3). JOISTS 1-1/2" MIN. BEARING ON BEAM; BLOCKING AT BEAM WHERE JOIST DEPTH > 2X10. N.T.S.

More floor framing & decks details

Joist Sister Connection Detail - DWG drawing

Joist Sister Connection Detail

Typical Floor Girder Detail - DWG drawing

Typical Floor Girder Detail

Post to Beam Detail - DWG drawing

Post to Beam Detail

Rim Joist to Joist Detail - DWG drawing

Rim Joist to Joist Detail

Built-Up Beam Detail - DWG drawing

Built-Up Beam Detail

Joist to Beam at Factory Notch Detail - DWG drawing

Joist to Beam at Factory Notch Detail

Base Plate Plan and Blocking - DWG drawing

Base Plate Plan and Blocking

Floor Joist Perpendicular to Exterior Wall Detail - DWG drawing

Floor Joist Perpendicular to Exterior Wall Detail