Codes and approvals referenced
Text on the drawing
DEFERRED ITEM SUBMITTED BY REVIEWED BY PREFABRICATED WOOD ROOF / FLOOR TRUSSES TRUSS MFR. EOR, THEN B.O. METAL STAIRS, GUARDS AND HANDRAILS FABRICATOR EOR, THEN B.O. PHOTOVOLTAIC SYSTEM / RACKING PV CONTRACTOR EOR (ROOF), B.O. FIRE SPRINKLER SYSTEM FIRE PROT. CONTR. FIRE DEPT. STOREFRONT / CURTAIN WALL GLAZING CONTR. EOR, THEN B.O. MECH. / ELEC. EQUIPMENT ANCHORAGE CONTRACTOR EOR, THEN B.O. DEFERRED SUBMITTAL PROCEDURE DEFERRED SUBMITTAL DOCUMENTS SHALL BE SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE, WHO SHALL REVIEW AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION THAT THEY HAVE BEEN REVIEWED AND FOUND IN GENERAL CONFORMANCE (CBC 107.3.4.1). DEFERRED ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. LIST ONLY ITEMS APPLICABLE TO THE PROJECT; DELETE THE REST. DESIGN CRITERIA FOR EACH ITEM PER GENERAL NOTES (LOADS, DEFLECTION LIMITS, SEISMIC / WIND PARAMETERS). N.T.S.
More general details

Braced Wall Lines and Panels - CRC R602.10 Detail

Wall Sheathing / Shear Wall Schedule

Common Wire Nail Sizes and Nail Loading Detail

Fireblocking and Draftstopping Detail

Mean Roof Height and Stories Above Grade Detail

Vertical Floor Offset - Shear Transfer Detail

Diaphragm Aspect Ratio and Opening Limits - Plan