Text on the drawing
1. PROVIDE TEMPORARY SHORING, BRACING, AND SUPPORT AS REQUIRED TO MAINTAIN THE EXISTING BUILDING IN A SAFE AND STABLE CONDITION THROUGHOUT CONSTRUCTION. TEMPORARY SUPPORT SHALL BE INSTALLED PRIOR TO REMOVAL OR DISTURBANCE OF ANY EXISTING FOUNDATION OR FLOOR SUPPORT. 2. TEMPORARY SHORING AND CONSTRUCTION SEQUENCING SHALL BE DESIGNED AND COORDINATED BY THE CONTRACTOR. DO NOT REMOVE MULTIPLE ADJACENT FOUNDATION SEGMENTS OR SUPPORT POINTS SIMULTANEOUSLY. 3. REMOVE EXISTING FOUNDATION, FLOOR FRAMING, POSTS, GIRDERS, AND OTHER SUPPORTING ELEMENTS ONLY WHERE REQUIRED FOR INSTALLATION OF THE NEW WORK. SAWCUT AND DEMOLISH CAREFULLY TO AVOID DAMAGE TO EXISTING WALLS AND ROOF FRAMING. 4. INSTALL NEW FOUNDATION IN CONTROLLED SECTIONS AS REQUIRED TO MAINTAIN CONTINUOUS SUPPORT OF THE EXISTING STRUCTURE. COMPLETE AND ADEQUATELY CURE EACH FOUNDATION SECTION BEFORE TRANSFERRING BUILDING LOADS TO THE NEW WORK. 5. FIELD VERIFY ALL EXISTING DIMENSIONS, WALL LOCATIONS, FLOOR ELEVATIONS, FRAMING CONDITIONS, AND FOUNDATION CONDITIONS PRIOR TO CONSTRUCTION. NOTIFY THE ENGINEER OF RECORD OF ANY DISCREPANCIES BEFORE PROCEEDING. 6. EXISTING WALLS SHALL BE TEMPORARILY SUPPORTED AND MAINTAINED PLUMB AND LEVEL. CONTRACTOR SHALL MONITOR THE STRUCTURE FOR MOVEMENT, SETTLEMENT, CRACKING, OR DISTRESS DURING CONSTRUCTION. STOP WORK AND NOTIFY THE ENGINEER IF DISTRESS IS OBSERVED. 7. EXISTING WALL FRAMING SHALL BE POSITIVELY CONNECTED TO THE NEW FOUNDATION AND FLOOR DIAPHRAGM. PROVIDE SILL ANCHORAGE, SHEAR TRANSFER, BLOCKING, CLIPS, STRAPS, AND HOLD-DOWNS AS SHOWN. 8. WHERE EXISTING STUDS, PLATES, RIM MEMBERS, OR SHEATHING ARE DAMAGED, DETERIORATED, OR UNSOUND, REMOVE AND REPLACE WITH NEW MATERIAL TO MATCH EXISTING SIZE AND GRADE, SUBJECT TO ENGINEER REVIEW. 9. THE CONTRACTOR IS RESPONSIBLE FOR MEANS, METHODS, SEQUENCING, TEMPORARY SUPPORTS, SITE SAFETY, AND PROTECTION OF ADJACENT PROPERTY. STRUCTURAL DRAWINGS SHOW THE COMPLETED PERMANENT CONSTRUCTION. N.T.S.