TYPDETAIL

Home / Repairs & Existing

New Footing Under Existing Wall - Underpinning Detail - typical repairs & existing detail drawing, DWG
Preview of new footing under existing wall - underpinning detail. The DWG is fully editable.

Text on the drawing

(E) FOOTING / STEM WALL DRYPACK (NON-SHRINK GROUT) 1" MIN. BETWEEN NEW AND (E) NEW FOOTING PER PLAN, (3) #4 BOT. + #4 VERT. @ 24" EXCAVATE AND POUR IN ALTERNATING SECTIONS 4'-0" MAX.; DO NOT UNDERMINE ADJACENT SECTIONS UNTIL CURED. BEARING DEPTH / WIDTH PER GEOTECH OR ENGINEERED DESIGN. DRYPACK AFTER 3 DAYS MIN. N.T.S.

More repairs & existing details

Infill at Former Garage Door Opening Detail - DWG drawing

Infill at Former Garage Door Opening Detail

Sister Joists - Repair Detail - DWG drawing

Sister Joists - Repair Detail

Fire-Damaged Top Plate Repair Detail - DWG drawing

Fire-Damaged Top Plate Repair Detail

Fire-Damaged Truss Repair Detail - DWG drawing

Fire-Damaged Truss Repair Detail

Fire-Damaged Eave Repair Detail - DWG drawing

Fire-Damaged Eave Repair Detail

Infill at Existing Window Opening Detail - DWG drawing

Infill at Existing Window Opening Detail

Exterior Wall Section - Typical - DWG drawing

Exterior Wall Section - Typical

Ceiling Section - Typical - DWG drawing

Ceiling Section - Typical