
Codes and approvals referenced
Text on the drawing
NEW 6X POST IN (E) WALL (OR BUILT-UP STUDS PER PLAN), BEAM ABOVE SOLID BLOCKING AT FLOOR UNDER POST, FULL BEARING POST IN CRAWL SPACE TO FOOTING ABU POST BASE (ESR-1622) W/ A.B. PER MFR. NEW PAD FOOTING PER PLAN CONTINUOUS LOAD PATH FROM BEAM TO FOUNDATION. ON SLAB-ON-GRADE: SAW-CUT AND POUR PAD FOOTING UNDER POST (S-FND-163). FOOTING SIZE PER PLAN / SOILS REPORT. N.T.S.







