
Codes and approvals referenced
Text on the drawing
SETBACK FOOTING PER PLAN POOL SHELL PER POOL ENGINEER 1:1 PLANE FROM FOOTING BOTTOM EDGE POOL WALL BELOW 1:1 PLANE MUST BE DESIGNED FOR FOOTING SURCHARGE, OR DEEPEN FOOTING (CRC R403.1.7.3 / CBC 1808.7). SETBACK TO SLOPES / POOLS PER GEOTECH REPORT WHERE MORE RESTRICTIVE. DETAIL # - POOL / EXCAVATION ADJACENT TO FOOTING - 1:1 PLANE NOT TO SCALE







