
Text on the drawing
POST PER PLAN SST ABU POST BASE INSTALL PER MANUFACTURER'S REQUIREMENTS UNDISTURBED SOIL 3 - #5 BOTH WAYS N.T.S.
More foundations details

Typical Perimeter Footing Detail

Typical Interior Footing Detail

Typical Non-Bearing Wall to Concrete Slab Detail

Dowel into Existing Concrete Slab Detail

New Footing to Existing Footing Detail

Concrete Footing to Existing Slab Detail

Concrete Slab to Existing Footing Detail
