Text on the drawing
30" MIN. WHERE REQ'D 24 GA. G.I. COPING, SLOPED TO ROOF, OVER SELF-ADHERED MEMBRANE 1/2" SHEATHING ROOF SIDE BASE FLASHING 8" MIN. ABOVE ROOF W/ COUNTERFLASHING / REGLET CANT STRIP & ROOFING MEMBRANE 19/32" WSP ROOF SHEATHING 1000S162-54 ROOF JOISTS @ 24" O.C. 1000T125-54 LEDGER TRACK W/ (2) #10 TO EA. STUD; CLIP ANGLE EA. JOIST 7/8" CEMENT PLASTER OVER LATH & WRB 600S162-43 STUDS @ 16" O.C., CONT. TO PARAPET TOP PARAPETS OVER 30" BRACED PER PLAN. FIREBLOCK STUD CAVITY AT ROOF LINE W/ MINERAL WOOL. LAP WRB OVER COPING MEMBRANE ON THE WALL SIDE; NO FASTENERS THROUGH THE TOP OF THE COPING. N.T.S.